SINOLIFT MATERIAL HANDLING EQUIPMENT CORP.
Add: No. 2471-2477 Dachuan Road, Nanhui Industry park, Pudong new District, Shanghai, P. R. China 201314.
Tel: 0086-21-68014500 58003681
Fax: 0086-21-68014262 68038190
Website:
www.sinolift.com www.sinolift.net
Email: sales@sinolift.com
Contact Person: Mr. David deng
Mobile: 0086-13817572420
Skype: sinolift
Two sets of independent upper and lower lifting structures;
Three groups of aluminum alloy mast combination for lower lifting structure and double mast combination for upper lifting structure;
The two structures can be shifted automatically with better operation and stability;
The guardrail can be entirely hung on the platform without occupying too much room, offering easy in passing through lower passage;
Its overall dimension is the smallest among similar products and it can be used both outside and indoor;
Electric driving unit is equipped for moving;
Power Supply: Single phase AC;
Traveling Method: powered propeller as standard;
manual traveling as option;
Available accessories: uninterruptible power supply;
Conforms to CE, one of National Key New Products 2001.
Specifications of GTWY Mast Aerial Work Platform (Three Masts):
Model | GTWY10-3000 | GTWY12-3000 | GTWY14-3000 | |
---|---|---|---|---|
Working Height | mm | 11700 | 13700 | 15700 |
Platform Height | mm | 10000 | 12000 | 14000 |
Platform Capacity | kg | 300 | 250 | 200 |
Loading Persons | p | 2 | 2 | 2 |
Platform Size | mm | 1480×800 | 1480×800 | 1580×800 |
Voltage | v/hz | Ac220/50 | Ac220/50 | Ac220/50 |
Power Pack | kw | 1.5 | 1.5 | 1.5 |
Stored Dimensions | mm | 1690x1040x2120 | 1690x1040x2480 | 1790x1040x2480 |
Net Weight | kg | 720 | 780 | 920 |
Feedback Form